Algorithm for integrated programming of production and preventive maintenance on identical parallel machines
Keywords:
production, maintenance, integrated programming, heuristic, simulated annealingAbstract
The present paper introduces an algorithm for the integrated programming of production and preventive maintenance in a productive configuration of identical parallel machines, aiming to minimize the total manufacturing time. The algorithm has been structured in two phases; in the first one, an initial solution is obtained, resulting from the application of a designed and proposed constructive heuristic that is inspired by the Largest Processing Time dispatch rule, with some modifications allowing it to consider the stochastic nature of the problem and the possibility that several jobs may have different release dates; in phase 2, an attempt is made to improve the initial solution using a simulated annealing method. As a way of evaluating its feasibility the algorithm was implemented in a company producing products derived from plastic, demonstrating through the results obtained its potential as a mechanism to improve operational capabilities.
Downloads
Published
How to Cite
Issue
Section
License
En caso de que el artículo presentado sea aprobado para su publicación, los autores, mediante el documento “Declaración de originalidad y Cesión de derechos de autor”, transfieren a la revista los derechos patrimoniales que tienen sobre el trabajo para que se puedan realizar copias y distribución de los contenidos por cualquier medio y en acceso abierto, siempre que se mantenga el reconocimiento de sus autores y no se haga un uso comercial de la obra.
El contenido completo de la licencia Creative Commons, bajo la cual se resguardan los derechos de autor de aquellos que publican en la revista Ingeniería Industrial, puede consultarse en: Creative Commons Attribution-NonCommercial 4.0 Unported License.